Ask the Vendor What Happens When the Accelerator Stops Answering
Before you ask how many inferences per watt an orbital NPU delivers, ask what the spacecraft does in the seconds after that NPU goes silent. Commercial accelerators flown in low Earth orbit don't usually fail outright. They hang, latch, or quietly corrupt their outputs. Every redundancy claim on a vendor's datasheet depends on who notices first, and what authority that observer has to act.
Who watches the watcher
The first question is whether the supervisor that detects a payload fault sits outside the payload's own silicon. If the watchdog lives on the same commercial SoC as the neural accelerator, a single-event functional interrupt can freeze both together, and the board looks healthy to the bus while producing nothing. Ask for the supervisor's part class, its power-cycle authority over each compute rail, and the trip behaviour of the current limiters that protect against latch-up. Then ask for heavy-ion test data gathered under radiation hardness assurance methods like the ESA and JEDEC test families, showing the linear energy transfer threshold at which latch-up first appears. A commonly applied screen for unprotected parts in LEO is roughly 37 MeV·cm²/mg, and a vendor who can't place their accelerator relative to that figure hasn't characterised the dominant failure mode of their own product.
If the container orchestrator needs a ground command to reschedule a crashed workload, a fault that hits during a pass gap stays unresolved until the next contact, so ask whether the scheduler, its desired state store and its image cache all survive and act on board with the link down.
Degraded modes compete for the same heat and bandwidth
Redundancy in orbit is never free, because a spare board that comes up shares the cold plate and the power string with the board that just failed. Ask the vendor to walk through the thermal transient of a failover. If the faulted unit stays partly powered while the spare boots, the radiator sees both, and a well-sized budget can be overrun exactly when the system is least stable. The second risk is in the data path. Reduction at the source exists because raw Earth observation frames are far larger than the downlink, by my estimate often by about an order of magnitude, so losing the NPU means the mission needs a deterministic policy for what it discards rather than falling back to raw downlink. A vendor who answers that question with "we downlink everything" has assumed away the very reason the payload exists.
Verifying claims you cannot reproduce in a lab
With limited lab access, the evidence you can realistically demand is fault-injection records and flight telemetry, not your own beam time. Ask for logs of injected accelerator hangs, corrupted model weights and failed boot images, each with the timestamps showing detection, isolation and return to a known-good image, run with the ground link disabled. Flight heritage helps only if it comes with reset counts and recovery durations per orbit, because a fleet that recovers well but resets constantly will lose a share of its compute duty cycle, my estimate being several percent in harsh regions like the South Atlantic Anomaly. The decision rule is simple: if the vendor can't show an autonomous recovery from an injected hang to a verified image with no ground involvement, treat every redundancy claim as unverified and price the mission as single-string. What remains open, even with good answers, is how silent data corruption gets caught, since a model that keeps running while returning plausible but wrong detections never trips any watchdog, so the next question is whether outputs get cross-checked by a second inference path or by sanity rules on the bus.
Technical FAQ: Is a fully radiation-hardened processor the only safe choice for in-orbit AI?
No. Most LEO compute architectures pair a commercial accelerator for throughput with a small radiation-tolerant supervisor that holds power and reset authority, and that split works only if the supervisor is truly independent and the commercial part's latch-up behaviour has been measured rather than assumed.